Galleries - Cranes - realizations
Gantry crane Q = 8t. Radio control. Gantry drive – with frequency converter. Hoist supply – the UNILIFT system with flat cables in the rubber insulation.
Suspended crane Q = 1 + 1t. Rebuilding of manual drives to mechanical ones. Radio control or from pedant control station. Motoreducers with double-pole engines in a bridge drive. Two hoists on a girde in working system 1, 1 + 2, 2
Two-girder overhead traveling crane Q = 20 t. Rebuilding of manual bridge and carrier drives to electrical ones. Radio control or from pedant control station. „Festoon” cables supplying a carrier produced by UNILIFT.
One-girder overhead traveling crane Q = 2,8 t + 2,8 t. Work in atmosphere of aggressive chemical compounds. Radio control or from pedant control station. Two hoists on a girde in working system 1, 1 + 2, 2. Frequency converters in lifting drives. Festoon”
Gantry crane Q = 5 t. Radio control or from pedant control station. Bridge drives with frequency converters. „Festoon” cables supplying a carrier produced by UNILIFT.
One-girder overhead traveling crane Q = 3,2 t. Radio control. Supply of pneumatic cross-bar with a cable unreeled from a drum with a spring drive.